Skip to main content

Advertisement

Table 4 Table of bowhead change point analysis results (Fig. 3), presenting for each phase: the times of initiation and completion and duration, estimates of the time scale parameter τ, and, in the right four columns, speed estimates: the random r.m.s. speed η, the x and y components of the mean velocity μ, and the mean tangential speed of the process ν. All speeds are in km/h

From: Correlated velocity models as a fundamental unit of animal movement: synthesis and applications

Phase Model Start End Duration Time scale Random Advective Mean
   (mm-dd hh:mm) (h) τ r.m.s. η μ x μ y ν
I UCVM 04-28 18:41 04-29 16:06 21.4 1.214 2.263    2.005
II ACVM 04-29 16:06 04-30 11:50 19.7 0.401 1.480 -0.49 -1.44 1.926
III UCVM 04-30 11:50 05-03 20:28 80.6 0.375 1.930    1.711
IV ACVM 05-03 20:28 05-04 14:22 17.9 0.234 1.361 1.49 1.14 2.144
V UCVM 05-04 14:22 05-07 02:04 59.7 0.036 1.247    1.105
VI UCVM 05-07 02:04 05-08 05:50 27.8 0.215 1.660    1.471
VII ACVM 05-08 05:50 05-09 14:19 32.5 0.196 1.010 -0.01 0.42 0.969
VIII UCVM 05-09 14:19 05-14 04:02 109.7 0.228 1.610    1.427
IX ACVM 05-14 04:02 05-15 03:24 23.4 0.017 0.733 -0.25 -0.24 0.721
X UCVM 05-15 03:24 05-18 05:58 74.6 0.114 1.430    1.267
XI UCVM 05-18 05:58 05-19 00:40 18.7 0.154 1.005    0.891
XII UCVM 05-19 00:40 05-21 14:26 61.8 0.263 1.647    1.460