Skip to main content

Table 4 Table of bowhead change point analysis results (Fig. 3), presenting for each phase: the times of initiation and completion and duration, estimates of the time scale parameter τ, and, in the right four columns, speed estimates: the random r.m.s. speed η, the x and y components of the mean velocity μ, and the mean tangential speed of the process ν. All speeds are in km/h

From: Correlated velocity models as a fundamental unit of animal movement: synthesis and applications

Phase

Model

Start

End

Duration

Time scale

Random

Advective

Mean

  

(mm-dd hh:mm)

(h)

τ

r.m.s. η

μ x

μ y

ν

I

UCVM

04-28 18:41

04-29 16:06

21.4

1.214

2.263

  

2.005

II

ACVM

04-29 16:06

04-30 11:50

19.7

0.401

1.480

-0.49

-1.44

1.926

III

UCVM

04-30 11:50

05-03 20:28

80.6

0.375

1.930

  

1.711

IV

ACVM

05-03 20:28

05-04 14:22

17.9

0.234

1.361

1.49

1.14

2.144

V

UCVM

05-04 14:22

05-07 02:04

59.7

0.036

1.247

  

1.105

VI

UCVM

05-07 02:04

05-08 05:50

27.8

0.215

1.660

  

1.471

VII

ACVM

05-08 05:50

05-09 14:19

32.5

0.196

1.010

-0.01

0.42

0.969

VIII

UCVM

05-09 14:19

05-14 04:02

109.7

0.228

1.610

  

1.427

IX

ACVM

05-14 04:02

05-15 03:24

23.4

0.017

0.733

-0.25

-0.24

0.721

X

UCVM

05-15 03:24

05-18 05:58

74.6

0.114

1.430

  

1.267

XI

UCVM

05-18 05:58

05-19 00:40

18.7

0.154

1.005

  

0.891

XII

UCVM

05-19 00:40

05-21 14:26

61.8

0.263

1.647

  

1.460