Skip to main content

Advertisement

Table 4 Posterior probability distributions

From: A path reconstruction method integrating dead-reckoning and position fixes applied to humpback whales

Whale Estimated parameter
σ x  (ms− 1) σ y  (ms− 1)
mean SD 95 % CI mean SD 95 % CI
1 0.006 0.001 0.004-0.008 0.005 0.001 0.004-0.006
2 0.010 0.002 0.007-0.014 0.009 0.001 0.006-0.011
3 0.009 0.001 0.007-0.012 0.010 0.001 0.008-0.012
4 0.007 0.001 0.005-0.009 0.007 0.001 0.005-0.009
5 0.008 0.003 0.004-0.015 0.015 0.004 0.009-0.023
6 0.006 0.001 0.004-0.007 0.007 0.001 0.005-0.009
7 0.007 0.001 0.006-0.009 0.006 0.001 0.005-0.008
8 0.006 0.001 0.004-0.008 0.007 0.001 0.005-0.011
9 0.004 0.000 0.003-0.004 0.003 0.000 0.003-0.004
10 0.014 0.001 0.012-0.015 0.012 0.001 0.010-0.013
11 0.014 0.001 0.012-0.017 0.012 0.001 0.010-0.015
12 0.005 0.001 0.004-0.007 0.012 0.002 0.009-0.015
13 0.010 0.001 0.008-0.011 0.009 0.001 0.007-0.010
  1. Mean, standard deviation (SD) and 95 % credibility interval (CI) of the marginal posterior distributions are provided for the velocity correction process SDs, σ x and σ y . For the posterior summaries of v cor1 and x 1, readers are referred to Additional file 3: Table S1